For Bose headphones · macOS
Your Bose headphones.
Your Bose headphones.
Finally on your Mac.
Switch devices, see the real battery and change noise mode, right from the menu bar. The Mac app Bose never made.
No account
540 KB
No tracking
Apple silicon & Intel
77%11 h
77%11 h
2 h 15 today46%
Real battery, to the percent
Noise mode, no phone needed
One click to switch device
Try it: click the chips
Everything, one click away.
No phone, no app store, no sign-in. Just your headphones, in your menu bar.
Switch devices
Move your headphones between Mac, iPhone and iPad in one click.
Real battery
Read from the battery voltage, not rounded to 10%. Plus hours left.
Quiet or Aware
Change noise mode without reaching for your phone.
Aware on calls
Hear your own voice in calls. Back to Quiet when you hang up.
Never caught empty
A nudge when 1 hour is left, and when charging is done.
Hearing budget
Listening time against the WHO weekly safe limit.
Small on purpose.
A native Mac app that stays out of your way.
0accounts
540 KBdownload
1click to switch
Install in a minute.
Free. macOS 14.4 or later.
One line
Paste in Terminal. It installs Earshot and opens it.
curl -fsSL https://earshot.hellofabien.com/install.sh | shDownload
- 1Download, unzip, drag Earshot to Applications.
- 2Open it. macOS will warn: Earshot isn't from the App Store.
- 3System Settings › Privacy & Security › Open Anyway. Only once.
Your headphones deserve a Mac app.
Works with Bose headphones you use with the Bose app. Built and tested on one model so far.
Download Earshot